Structural drying removes moisture from walls, floors and subfloors after water extraction. A typical residential job takes 3 to 5 days with daily moisture readings.
Call (647) 559-1203Structural drying is the controlled removal of moisture from building materials after water extraction. Moisture migrates into drywall, subfloors, framing and insulation. Drying uses psychrometric control: temperature, relative humidity and grains per pound of moisture in the air.
Equipment is placed by room volume and wet-material area. Daily readings are compared against a dry standard taken from unaffected materials in the same building. Drying ends when affected materials reach that standard.
Most residential structural drying projects take 3 to 5 days. Dense materials and deep saturation can extend the timeline. Readings are taken daily.
Not necessarily. Equipment runs continuously, and occupants can usually stay in unaffected rooms. The contractor advises based on the damage location.
Residual moisture supports mould growth, wood decay and swollen framing. Drying records also support the insurance claim.
Call the 24/7 emergency line to reach a partner restoration contractor.